Project Name: IP-based Video Surveillance Systems
Project Name: IP-based Video Surveillance systems Due Date: June 30, 2017 Issued By: Osage Casino 1211 West 36th Street North, Tulsa, OK 74127 Phone: 918-699-7719 • Fax: 918-699-7790 . 2 | P a g e Blank The warranty provides repair or replacement of all parts and labor on all workmanship ... Retrieve Document
D. Roof Covering - Advantage Home Inspection Services
The opinion of this inspector that roof is not a candidate for spot repair, has reached the end of its serviceable life Ceiling Insulation: Approx. 9" - 11" Loose Rock Wool (R26 - R32) Title: 20081111-01 Subject: 14343 E. Sooner Street, Tulsa, OK Created Date: 20090420130140Z ... Read More
Ambassador Hotel (Tulsa, Oklahoma) - Wikipedia
Ambassador Hotel (Tulsa, Oklahoma) Ambassador Hotel. U.S. National Register of It was originally built on a wooden frame a few feet above the slab ceiling and was covered with asphalt. The frame was deteriorated beyond repair by 1999 and needed to be replaced. ... Read Article
How To Make A Sprinkler Valve Cover - YouTube
How to make a Sprinkler Valve Cover WildmanDesignCo. Loading Unsubscribe from WildmanDesignCo? Cancel Unsubscribe. Working How to fix a leaking backflow preventer - repair Zurn Wilkins 950 950XL 975 975XL - Duration: 4:02. AdamDIY 53,054 views. ... View Video
123 Yourstreet / Assured Home Inspectors / Drew Sleezer
Tulsa, OK 74112 Assured Home Inspectors Drew Sleezer 70001227 Cell (918) 853-5113. Any recommendations by the inspector to repair or replace suggests a second The home inspector shall observe: Walls, ceiling, and floors; Steps, stairways, balconies, ... Access Document
Installation, Operation, And Maintenance Of Commercial ...
Locate the wall and ceiling joists that will support the assembly. 4. Install the threaded rod and angle that will be used to hang the assembly from the ceiling joists. 5. Move the assembly into position as indicated by the markings on the product. ... Access Document
Destroyed In Seconds - Wikipedia
Destroyed in Seconds Moscow, Russia 05 – in a 1.4 mile long car tunnel under the river there is ice from a ceiling leak and a jointed bus wipes out, fishtails and hits the wall. Tulsa, OK – Chillibowl Midget nationals. ... Read Article
TULSA PRESERVATION COMMISSION
In the flashing and that other strategies, such as repair of the flashing and siding 1536 E. 20th Street, Tulsa, OK 74120 the house, run through the joists and exit though the ceiling downstairs. ... Fetch Document
Residential Building Permit Application For The City Of ...
Residential Building Permit Application For the City of Glenpool, Oklahoma 1. Note: All repair inspections or 1 time inspection $25.00 5. Ceiling: Construction Type: Floor: Type of Work Being Done: ... Retrieve Document
Samuel Bak - Wikipedia
The possibility of repair, the repair of a broken world, Samuel Bak: Life Thereafter, Eva Atlan and Peter Junk. Felix Nussbaum Haus & Rasch, Tulsa, OK – 2008; Keene State College, Cohen Holocaust Center, Keene, NH – 2008; ... Read Article
2015 National Building Cost Manual - Craftsman Book Company
2015 NATIONAL BUILDING COST MANUAL 39th Edition $78.00 Craftsman Book Company 6058 Corte del Cedro, Carlsbad, CA 92011 Edited by slab or joist to the top of the roof slab or ceiling joist. Upper floors are measured from the top of the floor slab or floor joist to the top of the roof slab or ... Doc Viewer
SECTION 06650 SOLID SURFACE FABRICATIONS TUB SURROUNDS ...
SECTION 06650 SOLID SURFACE FABRICATIONS TUB SURROUNDS & SHOWER WALLS GSP Surfaces Suite 220, Tulsa, OK 74146, phone number 918-895-6300. B. Installer Qualifications Installers should be experienced in techniques moldings and ceiling and wall molding designed to protect and conceal ... Access This Document
ADDENDUM NUMBER 01 - Turnkey Construction Management
TULSA NORMAN, OK 73072 SUITE 100 900 36TH AVENUE NW FAX 405-364-1439 Addendum Number 01 has been incorporated into the drawing set and Project Manuals for bidding purposes by the Architect. equipment at the north dressing area is above the ceiling, no dedicated room ... Read Full Source
SECTION 8 PRE-INSPECTION CHECKLIST - Tulsa Housing
Out buildings must be in good shape and repair. more that 12” from the ceiling away from return air vents and bathroom doors. Tulsa Housing Authority Inspection Department Phone (918) 581-5791 or ... Read Full Source
SECTION 8 PRE-INSPECTION CHECKLIST - Tulsa ... - Tulsa Housing
INITIAL SECTION 8 PRE-INSPECTION CHECKLIST . This checklist is to help the unit pass the Housing Quality Standards Out buildings and garages must be in good shape and repair. Ceiling height throughout the entire area must be at least 7’1”. ... Read Content
REGULAR MEETING MINUTES OF THE TULSA PRESERVATION COMMISSION
Tulsa, OK 74103 . 1. Roll Call porch ceiling, creating square grid pattern. VI. Install clear view storm door at front entrance. VII. Remove non-original sliding glass doors on south could be cloned so that the Tulsa Preservation Commission could ... Document Retrieval
National Park Service Route 66 Corridor Preservation Program
OSU-Tulsa Library Michael Wallis Route 66 archive ALL AROUND National Park Service – Route 66 Corridor Preservation Program Rev. September 2016 The Route 66 Corridor Preservation Program is dedicated to preserving the Repair of the corridor ceiling, restoration of the exterior finish ... Fetch Full Source
Collar Ties Remedy For Sagging Roof? - Tim K. Garrison
Collar Ties Remedy for Sagging Roof? Dear Builder’s Engineer, My house was built in the early 70's, It sounds like your ceiling joists are already doing the job of keeping the rafter ends from thrusting outward, thus new collar ties would be redundant. ... Fetch This Document
HOW TO INSTALL YOUR 12 X 12 CEILING TILE USING THE EASY UP ...
2 1. Run Easy Up track in the opposite direction of the joists. Install track with #6 coarse thread screws. Screw length may vary, depending on your existing ceiling type. ... Get Doc
CHAPTER 6 WALL CONSTRUCTION - Iccsafe.org
Wall or segment of wall by six 8d nails on each side, pro-vided theraftersor joistsarecenteredoverthestudswith atoleranceofnomorethan1inch(25mm).Thetopplate may be omitted over lintels that are adequately tied to Ceiling joists to plate, ... Fetch Document
No comments:
Post a Comment